RED provided multidisciplinary expertise encompassing MEP, Architecture, Civil and Structural, and Security disciplines which has ensured a comprehensive design approach.

Client

Confidential

Location

Indonesia

Services

  • MEP Services

Sectors

  • Data Centres,
  • Technology

Sub-sector

  • Cloud Services,
  • Colocation

Period

10/01/2022

TALK ABOUT THIS PROJECT

Unlock the potential of your engineering projects with our expert consultation services. Our team of knowledgeable professionals is ready to provide guidance and innovative solutions tailored to your specific needs. Contact us today to discuss how we can help you achieve your goals.

Get in touch

PROJECT SUMMARY

The planned project is a new Data Center Development located in central Jakarta, Indonesia. featuring two phased built data center structures. The IX building will host eight data halls with 1 MW capacity each, and the Hyperscale building will have eight data halls with capacities of 4.5MW for each floor.

The project's MEP design meets UPTIME Tier 3 standards, ensuring N+1 redundancy for critical systems such as chillers, CHWPs, CRAHs, and fuel pumps. The projected peak PUE stands at 1.50 including UPS Battery charging and 1.45 excluding UPS battery charging for the IX building. While,

1.46 including UPS Battery charging and 1.40 excluding UPS battery charging for the Hyperscale building, showing a strong commitment to energy efficiency.

The design phase of the project began on January 10, 2022, and ended on June 27, 2022. Construction commenced following the final design phase submission and is expected to be completed by March 2024.

36MW

IT Load Capacity


IT Load Capacity: The IX building supports an 8MW IT load, while the Hyperscale Building accommodates 36MW, fully utilizing the available space within the data center buildings to enhance IT infrastructure.

TIER III

Reliability Standard


Reliability Standard: With a Tier III rating, our facilities ensure concurrent maintainability, allowing for system maintenance and upgrades without disrupting operations.

1.50PUE

Energy Efficiency


The IX building boasts a Power Usage Effectiveness (PUE) of 1.50, the Hyperscale building a PUE of 1.46, and the entire campus maintains a PUE of 1.47. This shows our commitment to maximizing energy efficiency within the scope of operational plant.

Our team was delighted to successfully complete the design and we remain dedicated to meeting clients' expectations, delivering the project on time and on budget.

Quak Wee How

Senior Design Manager in RED Engineering