Client
İş Bank
Location
Turkey
Services
- MEP Services
Sectors
- Data Centre Design Services,
- Technology
Sub-sector
- End User
Period
31/07/2017
As lead designer and consultant, RED provided Architectural, Structural and Seismic Engineering, Mechanical, Electrical and Plumbing Engineering Services.
The İş Bank project included site selection, concept and detailed design, tender management, permit and certification, construction supervision, test and commissioning management, and training.
(Stock images used for illustration purposes, not project-specific visuals).
TALK ABOUT THIS PROJECT
Unlock the potential of your engineering projects with our expert consultation services. Our team of knowledgeable professionals is ready to provide guidance and innovative solutions tailored to your specific needs. Contact us today to discuss how we can help you achieve your goals.
Get in touchPROJECT SUMMARY
First Tier IV Certified and seismically base isolated Data Centre Project in Turkey.
1,460
1,460MWh/ annum per 1000kW
Annual energy saving of up to 1,460MWh/ annum per 1000kW IT when compared against conventional designs
M7+
M7+ earthquake
Seismic countermeasures incorporated to ensure continuous data centre operation during a seismic event (M7+ earthquake)
2017
MEP Sustainable Project of the Year 2017
Certification: Uptime Institute Tier IV Design & Facility, TCOS Tier IV certified, LEED Gold v.4 Recognition: Data Centre Dynamics, Infrastructure Scale-out Award 2017, MEP Sustainable Project of the Year 2017
RED provided engineering design and building services from initiation until completion. Working with technical experts at every stage, our global team was recognised with certifications and won awards globally.Onder Ayan
IT Manager, İş Bank Data Centre