Callaghan|RED (CRE) conducted Detailed Design and site monitoring for a 60MW power generation site in Grange Castle Dublin, serving a hyperscale Data Centre Operator. The project included 22 containerised Jenbacher engines arranged in sets, with gas distribution and readiness for renewable deployment

Client

Confidential

Location

Ireland

Services

  • MEP Services

Sectors

  • Data Centres,
  • Technology

Sub-sector

  • Process Plant

Period

01/12/2021

TALK ABOUT THIS PROJECT

Unlock the potential of your engineering projects with our expert consultation services. Our team of knowledgeable professionals is ready to provide guidance and innovative solutions tailored to your specific needs. Contact us today to discuss how we can help you achieve your goals.

Get in touch

PROJECT SUMMARY

The Gas Generator project provides is required to meet stringent Grid operator constraints for DC projects. The gas generator system provides up to 60MW of demand flex power generation for up to 2,000 hours operation per annum. Is also provides 100% black start backup to the DUB15.

24/7

operation.


Provides Grid Access, allow for 24/7 operation.

60MW

of Backup power


Provides 60MW of Backup power