Projects


40MW Data Centre

The data centre in Johor Bahru covers 49 acres, initially developing 11 acres with a 33kV substation, visitor centre, and one data hall. Future phases will add eight data halls and a 275kV substation. The facility will be prefabricated for ICT equipment, achieving a PUE of 1.3 and LEED Gold certification, with MEP design and support from RED.

(Stock images used for illustration purposes, not project-specific visuals).

Client

Confidential

Location

Malaysia

Services

  • MEP Services

Sectors

  • Data Centre Design Services,
  • Technology

Sub-sector

  • Colocation

Period

01/04/2024

TALK ABOUT THIS PROJECT

Unlock the potential of your engineering projects with our expert consultation services. Our team of knowledgeable professionals is ready to provide guidance and innovative solutions tailored to your specific needs. Contact us today to discuss how we can help you achieve your goals.

Get in touch

PROJECT SUMMARY

A hybrid data centre in Johor Bahru will feature 9 data halls, prefabricated design, and support from RED for 12 months.

Boosting RED's Liquid Cooling Design with AI

This will be beneficial to RED as this would strengthen our capability in delivering liquid cooling design to our clients based on market demand and needs as we embark on the use of Artificial Intelligence (AI).

Expanding RED's Footprint in Asia Pacific with Liquid Cooling

This project will strengthen our footprint in Malaysia and in Asia Pacific region where clients have started to explore the use of liquid cooling as an efficient and cost-effective way to enhance their data centre facility. Facilities using liquid-cooled system are designed for high-density and high-performance computing environments ideal for Artificial Intelligence (AI) which is where the market is moving into.

Key Role of Data Centre Design in Project Sustainability

The design of this data centre plays a pivotal role in the development of the project in terms of project sustainability, ensuring the facility’s efficiency, cost-effectiveness and reliability compared to using the traditional air-cooled system.

We are delivering multiple projects with this key client in Malaysia, Singapore and Indonesia; we actively listened to client's needs, and consistently delivered above expectations for all projects. This has elevated RED to become the Client's partner of choice

Joe Ong Cher Shyan

Technical Director I Project Director