Projects
Wembley W03
W03 is a twin tower residential scheme comprising of 340no. mixed use apartments in Wembley, London.
The key mechanical and electrical services include:
- District heating substation network providing Low Temperature Hot Water to the apartments for space heating
- Smart in-house BT fibre broadband system connected to the sitewide Wembley broadband network
- Dual fed smoke extract and supply ventilation system providing chilled air to the communal corridors
RED Solution
- Commissioning management of the mechanical, electrical and public health services
- Commission-ability reviews of the mechanical and electrical services schematics and specifications
- Technical reviews of the commissioning method statements.
- Charing and coordination of monthly building services commissioning meetings on site discussing key trade-to-trade interfaces and interdependencies
- Production of fortnightly look-ahead schedules highlighting the key upcoming testing and commissioning works
- Hands on approach to solve engineering problems.

Key Facts
- All 340No. Apartments will be on a let-only basis.
- Each apartment includes sub-metering for the electrical, heating, cold and hot water consumption to allow individual billing.,
- The apartments form part of a converged network which connects and monitors the access controls, fire alarm, broadband and BMS to ensure this is operated on one platform
Client: |
Box & Charnock |
Location: |
UK |
Capabilities: |
Specialist Engineering |
Sectors: |
Living, Learning and Leisure |
Sub‑sector: |
Commissioning Management |
Period: |
Overall project completion is due September 2019 |